IHI Infrastructure Systems Co.,Ltd.

start global navi.

グローバルメニューここまでです。

Truss Bridge

Agatsuma-River Bridge

Agatsuma-River Bridge
Client Gunma Prefecture
Bridge type Truss Bridge
Erection method Cable Erection
Completed in 2017
Location Gunma Prefecture, Japan

 

YK13

YK13
Client Metropolitan Expressway Company Limited.
Bridge type Truss Bridge
Erection method Launching Erection
Completed in 2014
Location Kanagawa Prefecture, Japan

 

Tsuge Bridge

Tsuge Bridge
Client West Nippon Expressway Company Limited
Bridge type Truss Bridge
Erection method Truck Crane Bent Erection
Completed in 2003
Location Kouchi Prefecture, Japan

 

Tama-River Bridge

Tama-River Bridge
Client Japan Highway Public Corporation, Tokyo Construction Bureau
Bridge type 4-span continuous Double Deck Truss Bridge
Erection method Truck Crane Bent Erection + Cantilever Erection by Traveller Crane
Completed in 2000
Location Tokyo, Japan

Hanoi-Ho Chi Minh City Railway Bridge

ベトナム鉄道橋
Client Thuy Hoa City, Nha Trang City, Vietnam.
Bridge type Truss Bridge
Erection method Truck Crane Bent Erection
Completed in 2000
Location Socialist Republic of Vietnam
  • Replacement of railway bridges connecting Hanoi and Ho Chi Minh City.
  • The project includes reinforcement of the existing base structures, demolition and replacement of the Da Rang Bridge structure (21 continuous truss bridge) and Song Hong Bridge (4 continuous truss bridge)

Kansai Airport Access Bridge (Sky Gate Bridge R)

Kansai Airport Access Bridge (Sky Gate Bridge R)
Client Kansai International Airport Co., Ltd.
Bridge type Truss Bridge
Erection method Truck Crane Bent Erection + Assembled Large Block Erection Method by Floating Crane
Completed in 1993
Location Osaka Prefecture, Japan

The longest truss bridge in the world. The bridge provides both road and rail access to the airport.
The access bridge is multi-leveled; the upper-level is a 6 lane road, the lower level is a 2 track railway.

Ishizuma Bridge

Ishizuma Bridge
Client Okayama Prefecture
Bridge type 4-span continuous Truss Bridge
Erection method Cantilever Erection by Traveller Crane
Completed in 1990
Location Okayama Prefecture, Japan

 

Gramercy Bridge (Veterans Memorial Bridge)

Gramercy Bridge (Veterans Memorial Bridge)
Client Louisiana Department of Transportation and Development
Bridge type Truss Bridge
Erection method Cantilever Erection by Floating Crane
Completed in 1985
Location Gramercy, Louisiana, USA

A typical American truss bridge.

Edo River Water Bridge

Edo River Water Bridge
Client Japan Railway Construction Public Corporation
Bridge type Truss Bridge
Erection method Truck Crane Bent Erection + Cantilever Erection by Traveller Crane
Completed in 1985
Location Tokyo, Japan

 

Arakawa River Flood Control Channel Bridge

Arakawa River Flood Control Channel Bridge
Client Japan Railway Construction Public Corporation
Bridge type Cantilever Truss Bridge
Erection method Cantilever Erection by Traveller Crane
Completed in 1985
Location Tokyo, Japan

The railway bridge crosses the mouth of the Arakawa River.
The bridge spans are aligned with the Metropolitan Expressway Bay Shore route.
Train safety measures against strong winds are taken.

Kamagari Bridge

Kamagari Bridge
Kamagari Bridge
Client Hiroshima Prefecture
Bridge type 3-span continuous Truss Bridge
Erection method Assembled Large Block Erection Method by Floating Crane
Completed in 1979
Location Hiroshima Prefecture, Japan

 

Other Products

Page Top