IHI Infrastructure Systems Co.,Ltd.

start global navi.

グローバルメニューここまでです。

Bridge Maintenance

1st & 2nd Bosphorus Bridge Rehabilitation Project

第一・第二ボスポラス橋大規模補修工事
Client Ministry of Public Works and Settlement,Turkey
Location Turkey
Construction overview Replacemento of Hanger Cables,Main Cable Wrapping etc
Installation of Dehumidification System
Completed in 2016

Wakato Bridge (Rehabilitation)

若戸大橋ケーブル関係補修工事
Client Kitakyushu City Road public corporation
Location Fukuoka Prefecture, Japan
Construction overview Replacement of hannger,
Cable-Band Bolt etc
Completed in 2012

Wakato Bridge (Rehabilitation)

若戸大橋鋼床版連続化工事
Client Kitakyushu City Road public corporation
Location Fukuoka Prefecture, Japan
Construction overview Connection of Stell Deck
Reinforcement of Truss Beam
Completed in 2017

Rainbow Bridge (Rehabilitation)

レインボーブリッジ主ケーブル補修工事
Client Metropolitan Expressway Company Limited.
Location Tokyo, Japan
Construction overview Repaint of Main Cable
Coking the cable band
Completed in 2016

Sabane Bridge (Upgrade of Seismic Performance)

猿羽根大橋耐震補強工事
Client Yamagata Prefecture, Japan
Location Yamagata Prefecture, Japan
Construction overview Replacement of Bearing
Completed in 2016

Arakawa-Wangan Bridge(Upgrade of Seismic Performance)

荒川湾岸橋 耐震補強工事
Client Metropolitan Expressway Company Limited.
Location Tokyo, Japan
Construction overview Reinforcement of Truss Point
Installation of Damper
Installation of bridhe collapse prevention device
Completed in 2013

Other Products

Page Top