Pump well located at the bottom with the depth of 300mmm ensures complete
discharge of cargo liquid if required, because the main pump can pump out
liquid so that he level reaches -150mm .
The filling line for liquid
does not terminates at the bottom but extends to both fore end and aft end
of the tank. This makes purging very effective.
Horizontal girder is used as platform for inspection. In dry dock
inspection of all tans are completed in a half day. |