Bridge Maintenance
1st & 2nd Bosphorus Bridge Rehabilitation Project
![第一・第二ボスポラス橋大規模補修工事](i/bosporus.jpg)
Client | Ministry of Public Works and Settlement,Turkey |
---|---|
Location | Turkey |
Construction overview | Replacemento of Hanger Cables,Main Cable Wrapping etc Installation of Dehumidification System |
Completed in | 2016 |
Wakato Bridge (Rehabilitation)
![若戸大橋ケーブル関係補修工事](i/wakato_cable.jpg)
Client | Kitakyushu City Road public corporation |
---|---|
Location | Fukuoka Prefecture, Japan |
Construction overview | Replacement of hannger, Cable-Band Bolt etc |
Completed in | 2012 |
Wakato Bridge (Rehabilitation)
![若戸大橋鋼床版連続化工事](i/wakato.jpg)
Client | Kitakyushu City Road public corporation |
---|---|
Location | Fukuoka Prefecture, Japan |
Construction overview | Connection of Stell Deck Reinforcement of Truss Beam |
Completed in | 2017 |
Rainbow Bridge (Rehabilitation)
![レインボーブリッジ主ケーブル補修工事](i/rainbowbridge.jpg)
Client | Metropolitan Expressway Company Limited. |
---|---|
Location | Tokyo, Japan |
Construction overview | Repaint of Main Cable Coking the cable band |
Completed in | 2016 |
Sabane Bridge (Upgrade of Seismic Performance)
![猿羽根大橋耐震補強工事](i/sabane.jpg)
Client | Yamagata Prefecture, Japan |
---|---|
Location | Yamagata Prefecture, Japan |
Construction overview | Replacement of Bearing |
Completed in | 2016 |
Arakawa-Wangan Bridge(Upgrade of Seismic Performance)
![荒川湾岸橋 耐震補強工事](i/arakawa.jpg)
Client | Metropolitan Expressway Company Limited. |
---|---|
Location | Tokyo, Japan |
Construction overview | Reinforcement of Truss Point Installation of Damper Installation of bridhe collapse prevention device |
Completed in | 2013 |