Kachidoki land bridge
Client | Tokyo Prefecture |
---|---|
Bridge type | 9-span continuous Rigid Frame Box Girder Bridge Simply supported I Girder Bridge Two 2-span continuous Box Girder Bridges Two Simply supported I Girder Bridges Six Steel piers |
Erection method | Truck Crane Bent Election |
Completed in | 2015 |
Location | Tokyo, Japan |
Central Circular Route, Nishi Shinjyuku Junction: SJ32
Client | Metropolitan Expressway Co., Ltd. |
---|---|
Bridge type | Steel Deck Girder Bridge |
Erection method | Cantilever Erection by Traveller Crane |
Completed in | 2007 |
Location | Tokyo, Japan |
- Located at above Route 4 Shinjuku-line and Hatsudai intersection.
- In addition to the orthogonally-branched structure, the bridge has many bend sections and a complicated geometrical configuration to avoid interference with the existing bridge columns and buried objects.
Moto Bridge
Client | Nagano Prefecture |
---|---|
Bridge type | 5-span continuous Rigid Frame Bridge |
Erection method | Diagonal Hanging Cable Erection |
Completed in | 1998 |
Location | Nagano Prefecture |
Nishizawa Bridge
Client | Yamanashi Prefecture |
---|---|
Bridge type | 5-span continuous Rigid Frame Bridge |
Erection method | Truck Crane Bent Erection |
Completed in | 1994 |
Location | Yamanashi Prefecture, Japan |
Hinode Bridge
Client | Kajima Corporation |
---|---|
Bridge type | 1-span steel-concrete composite deck slab Girder Bridge |
Erection method | Truck Crane Bent Erection + Diagonal Hanging Cable Erect |
Completed in | 1994 |
Location | Hyogo Prefecture, Japan |
Osaka Monorail Senri-Chuo Station
Client | Osaka Prefecture, Japan |
---|---|
Bridge type | Rigid Frame Box Girder Bridge |
Erection method | Truck Crane Bent Erection |
Completed in | 1986 |
Location | Osaka Prefecture, Japan |
The elevated monorail station was built aligned with the underground subway system. For this reason, the structure became a complicated space frame structure.
Ochiai Bridge
Client | Nagano Prefecture, Japan |
---|---|
Bridge type | 3-span continuous Rigid Frame Girder Bridge |
Erection method | Diagonal Hanging Cable Erection |
Completed in | 1981 |
Location | Nagano Prefecture, Japan |
- Located at the end of the Venus Line, which takes us to Utsukushigahara Kogen.
- The slender structure and green coloring matches the surrounding extensive forest.
Ogashira Bridge
Client | Tochigi Prefecture, Japan |
---|---|
Bridge type | 3-span continuous Rigid Frame Girder Bridge |
Erection method | Diagonal Hanging Cable Erection |
Completed in | 1982 |
Location | Tochigi Prefecture, Japan |
A typical bridge that crosses a canyon
Akasakamitsuke Bridge
Client | Tokyo, Japan |
---|---|
Bridge type | 3-span continuous Rigid Frame Girder Bridge |
Erection method | Truck Crane Bent Erection |
Completed in | 1963 |
Location | Tokyo, Japan |