Penstock

Dai Ninh Hydropower Project

Client ELECTRICITY OF VIET NAM
Equipment Penstock
Size Pipe Size3.2m~2.25m, Total extension 2270m
Completed in 2007
Location Vietnam
Dai Ninh Dam
Dai Ninh Dam
Dai Ninh Dam

Matsuo-gawa No.1 Power Station

Matsuo-gawa No.1 Power Station
Client Shikoku Electric Power Co., Inc.
Equipment Penstock
Size Pipe Size2.1m~0.7m, Total extension 1080m Design head 448m
Completed in 2004
Location Tokushima Prefecture, Japan

Sondu Miriu Hydropower Project

Sondu Miriu Hydropower Project
Sondu Miriu Hydropower Project
Client KENYA ELECTRICITY GENERATING COMPANY LTD
Equipment Penstock
Size Pipe Size3.6m~1.65m, Total extension 1215m
Completed in 2007
Location Kenya

Okumino Hydropower Project

Okumino Hydropower Project
Client Chubu Electric Power Co., Inc.
Equipment Penstock
Size Diameter : 3.9m
Design head : 759.9m
Maximum pipe thickness : 71mm
Material : SHY658NS-F
Completed in 1999
Location Gifu Prefecture, Japan