Penstock
Dam Gate
River Gate
Penstock & Aqueducts
- Crest Roller Gate
- Crest Radial Gate
- Crest Flap Gate
- High Pressure Roller Gate
- High Pressure Radial Gate
- High Pressure Slide Gate
- Tensile Radial Gate
- Jet-flow Gate
- Circular Multi-stage Gate
- Linear Multi-stage Gate
- Semi-circular Multi-stage Gate
- Linear Multi-gate
- Perforated Gate
- Siphon Type
- Multi-stage Float Membrane Gate
- Temporary Coffering
Dai Ninh Hydropower Project
Client | ELECTRICITY OF VIET NAM |
---|---|
Equipment | Penstock |
Size | Pipe Size3.2m~2.25m, Total extension 2270m |
Completed in | 2007 |
Location | Vietnam |



Matsuo-gawa No.1 Power Station

Client | Shikoku Electric Power Co., Inc. |
---|---|
Equipment | Penstock |
Size | Pipe Size2.1m~0.7m, Total extension 1080m Design head 448m |
Completed in | 2004 |
Location | Tokushima Prefecture, Japan |
Sondu Miriu Hydropower Project


Client | KENYA ELECTRICITY GENERATING COMPANY LTD |
---|---|
Equipment | Penstock |
Size | Pipe Size3.6m~1.65m, Total extension 1215m |
Completed in | 2007 |
Location | Kenya |
Okumino Hydropower Project

Client | Chubu Electric Power Co., Inc. |
---|---|
Equipment | Penstock |
Size | Diameter : 3.9m Design head : 759.9m Maximum pipe thickness : 71mm Material : SHY658NS-F |
Completed in | 1999 |
Location | Gifu Prefecture, Japan |