IHI Powersystems

start global navi.

グローバルメニューここまでです。

Achievement

Valuable comments from our customers and a look into our gas turbine business history


History

1948 Study and development of Industrial gas turbine started
1953 500 horsepower class gas turbine developed
1954 IGT60, 60 horsepower class gas turbine, developed and delivered as fire pump equipment
1964 IGT300, 300 horsepower class gas turbine, developed
1965 IM100, 1050 horsepower class gas turbine, developed and started running tests using our own experiment boat (*1)
1967 IGT350, 350 horsepower class gas turbine developed and delivered as emergency power generation equipment
1968 8200 horsepower class gas turbine developed
1968 IM300, 3000 horsepower class gas turbine, developed
1968 IM100, 1050 horsepower class gas turbine started and delivered for hovercrafts, power generation, trains
1968 IM1500, 15000 horsepower class gas turbine, developed and delivered for power generation
1969 IM300, 3000 horsepower class gas turbine, began delivering for ships
1972 1000kVA mobile generator set using IM100, 1050 horsepower class gas turbine, delivery begins
1975 IGT90, 90 horsepower class gas turbine, developed
1977 10000kVA mobile generator set using IM1500, 15000 horsepower class gas turbine, delivery begins (*2)
1977 2000kV power generation equipment using IM310, 3000 horsepower class gas turbine, delivery begins
1978 IM5000, 50000 horsepower class gas turbine, developed and delivery begins for power generation (*3)
1979 2500kV power generation equipment using IM400, 3000 horsepower class gas turbine, delivery begins
1980 IM2000 , 18000 horsepower class gas turbine, developed
1980 S7, 14400 horsepower class gas turbine, developed and delivery begins
1982 S3, 7900 horsepower class gas turbine, developed and delivery begins
1982 Power generation equipment using LM2500, 25000 horsepower class gas turbine, delivery begins (*4)
1990 XGT1, 1500 horsepower class gas turbine delivery begins for veichles
1990 IM150, 1500 horsepower class gas turbine, developed and delivery begins (*5)
1993 IM610, 6100 horsepower class gas turbine, developed and delivery begins
1993 Power generation equipment using LM6000PA, 60000 horsepower class gas turbine, delivery begins (*6)
1994 Power generation equipment using LM1600, 16000 horsepower class gas turbine delivery begins (*7)
1995 IM270, 2700 horsepower class gas turbine developed and delivery begins (*8)
1997 Thermoelectric variable type IM400 IHI-FLECS delivery begins (*9)
1997 I-monitor, remote monitoring system developed and services start for Japanese users
1997 Power generation equipment using output improvement type of LM 6000PC delivery begins
1998 Power generation equipment using NOx reduction type of LM 6000PD delivery begins
1999 Energy providing business started using IM400-FLECS type as PFI model buisiness
2000 IM150, 1500 horsepower class gas turbine developed and power generation equipment delivery begins
2000 Gas turbine service center established in Singapole
2001 I-monitor, remote monitoring system services started for customers out side of Japan
2003 Wholesale power company established to enter power retailing market
2004 LM2500+, 40000 horsepower class gas turbine, delivery begins for techno super liner
2004 Thermoelectric variable type IM270 IHI-FLECS delivery begins
2009 Power generation equipment using LM2500+G4, 47000 horsepower class gas turbine, delivery begins
2010 Power generation equipment using LM2500PJ, 30000 horsepower class gas turbine, delivery begins
2011 Perth Service Centre established (Regional Service Center for Australia) (*10)
2012 IHI Power Systems Thailand established (Regional Service Center for Thai and Southeast Asia)
2012 Power generation equipment using LM6000PF using output improvement /Nox reduction type delivery begins
2013 Cheyenne Service Center established (Regional Service Center for Americas)
2013 The number of LM6000 gas turbine maintenance at depot reached 100
2013 Customer operations support center having constant remote monitoring, computer analytics, TV phone opened in headquaters (*11)
*1

*2

*3

*4

*5

*6

*7

*8

*9

*10

*11

Page Top